Sasaki Steel Structure
Posted: 03.25.11
We've finished the steel structure. Our pre fabricated steel done by C2C has been delivered, placed, welded and finished. We are now able to remove the temporary structure that has been supporting the house for the past few months. Next we'll be finishing the slab and installing our window systems. We'll also be installing a lanai and roof which we've shop fabricated.